Honda HR-V: Continuously Variable Transmission (CVT) - Testing & Troubleshooting
READ NEXT:
Inspection
1. Differential Backlash - Inspect
Install both axles into the differential, then place the axles on
V-blocks (A)
Check the backlash of the pinion gears (B) using a dial indicator (C)
Special Tools Required
Preload Inspection Tool 070AJ-5T0A100
Driver Handle, 40 mm I.D. 07746-0030100
Inspection
NOTE:
If the transmission housing, the torque converter housing, the final
drive s
SEE MORE:
DLC ELECTRONIC WIRING DIAGRAM
Refer to the appropriate Diagram System Wiring Diagrams
EGR SYSTEM ELECTRONIC WIRING DIAGRAM
Refer to the appropriate Diagram System Wiring Diagrams
ETCS (ELECTRONIC THROTTLE CONTROL SYSTEM) ELECTRONIC WIRING DIAGRAM
Refer to the appropriate Diagram System Wiring Diagra
NOTE: Before testing, check for DTCs. If any DTCs are indicated, troubleshoot
the indicated DTCs first.
1. Connect the HDS to the data link connector (DLC).
2. Turn the vehicle to the ON mode.
3. Select KEYLESS ACCESS CONTROL UNIT from the ONE-PUSH START system select menu
with the
HDS.
4. Sele